Machine Utilisation %
See what share of available shift time the machine was actually running. Complements yield and capacity planning.
Utilisation % = (Running time ÷ Available shift time) × 100
—
Fill running & available time
% util
Notes
- Available time = shift length minus planned breaks (or full shift if you include breaks in downtime)
- Running time = time the machine was producing (exclude setup, breakdown, no-plan, quality holds if you want pure run util)
- This is not full OEE — OEE also multiplies availability × performance × quality
Low utilisation with high yield usually means planning or material gaps. High utilisation with low yield means process/quality issues.